Building the boat
 
Snecklifter began building at Heron Boats in Mirfield on November 5, 2001 and was launched on March 22,2002.  These  
photographs are just a few of the dozens taken during its progress from baseplate to live-aboard narrowboat.
 
 Ian works on Snecklifter's bow which is now 
fully welded to the body
A grinder does some final fettling on Snecklifter's 
almost finished shell
With foam insulation complete, electrician  
Mark has started wiring
Carpenter Jerry's craftsmanship made the 
boat into our home.
Snecklifter's bottom is blacked and Mark is now  
undercoating
  Snecklifter emerges into daylight as Dean heads 
for Lesley with his lunch order
Graham stands astride Snecklifter like a colossus 
as the boat is lifted over NB Stravaig
Closer to the water, Snecklifter is only moments 
away from launching.
Inside, the saloon is piled high with personal 
belongings waiting to be unpacked
Work continues on installing batteries and other 
electrical equipment at Snecklifter's stern