Building the boat
|
|
Snecklifter began building at Heron Boats in Mirfield on November 5, 2001 and was launched on March 22,2002. These
photographs are just a few of the dozens taken during its progress from baseplate to live-aboard narrowboat.
|
|
Ian works on Snecklifter's bow which is now
fully welded to the body
|
A grinder does some final fettling on Snecklifter's
almost finished shell
|
|
With foam insulation complete, electrician
Mark has started wiring
|
Carpenter Jerry's craftsmanship made the
boat into our home.
|
|
Snecklifter's bottom is blacked and Mark is now
undercoating
|
Snecklifter emerges into daylight as Dean heads
for Lesley with his lunch order
|
|
Graham stands astride Snecklifter like a colossus
as the boat is lifted over NB Stravaig
|
Closer to the water, Snecklifter is only moments
away from launching.
|
|
Inside, the saloon is piled high with personal
belongings waiting to be unpacked
|
Work continues on installing batteries and other
electrical equipment at Snecklifter's stern
|
|
|
|